🚚 Free Worldwide Shipping on All Orders!Shop Now
HomeStore

TLD Flowline Mips Helmet - Orbit Cinnamon -

Product image 1
Product image 2
Product image 3
Product image 4

TLD Flowline Mips Helmet - Orbit Cinnamon -

TLD Flowline Mips Helmet - Orbit Cinnamon -

The all-new Flowline Helmet is hand picked, literally, by the pros and for good reason. The Flowline Helmet features a combination of comfort, cool and signature TLD style. It's NTA-8776 certified, making it the perfect choice for any rider looking to hit their local trails or cruise the streets on their e-bikes.

SPECIFICATIONS

  • 3-Way adjustable screwless visor
  • MIPS B-Series Rotational Impact Brain Protection System
  • Full 360-degree fit retention system with 3-way rear height adjustment 
  • 14 vents for maximum airflow
  • Full wrap in-mold construction
  • Extended Coverage MTB Trail Helmet
  • Side strap adjusters 
Select Size
From $30.96

Original: $88.46

-65%
TLD Flowline Mips Helmet - Orbit Cinnamon -

$88.46

$30.96

Product Information

Shipping & Returns

Description

The all-new Flowline Helmet is hand picked, literally, by the pros and for good reason. The Flowline Helmet features a combination of comfort, cool and signature TLD style. It's NTA-8776 certified, making it the perfect choice for any rider looking to hit their local trails or cruise the streets on their e-bikes.

SPECIFICATIONS

  • 3-Way adjustable screwless visor
  • MIPS B-Series Rotational Impact Brain Protection System
  • Full 360-degree fit retention system with 3-way rear height adjustment 
  • 14 vents for maximum airflow
  • Full wrap in-mold construction
  • Extended Coverage MTB Trail Helmet
  • Side strap adjusters 
TLD Flowline Mips Helmet - Orbit Cinnamon - | Jonny Sprockets